Fürstenfeldbruck_2016
Konvent der Bürgermeister/innen - Monitoring 2017 Mitigation Actions Action Plan 1) Title Wir gehen die Energiewende an! 2) Date of formal approval 24 April 2012 current status 23.02.2017 3) Decision body approving the plan Stadtrat Fürstenfeldbruck 4) SECAP webpage www.fuerstenfeldbruck.de 6) Methodological notes Emission factors: IPCC; national emission factor for German electricity in 2015: Umweltbundesamt; value used for "other biomass" (wood): mean value of range given in SEAP guide because source of wood is unknown; emission factors for electricity and heat/cold:computed with the formulas given in the SEAP guide; electricity: locally produced amount completely deducted; national emission factor remains unchanged because locally produced amount is very small in relation to national one; CHPP at sewage faciliaty: amount of produced gas unknown; traffic measured on territorial scale -82 chars left 7) Estimates of the impacts of actions in 2020 in relation to: BEI (option 1) Estimates of the impacts of actions in 2030 in relation to: BEI (option 1) Estimates of the impacts of actions in long-term target year in relation to: BEI (option 1) i Hide rows as appropriate to the time horizon(s) of your action plan. Key Actions i Please start by providing your totals by sector and add your key actions afterwards. i Add as many rows for your key actions as necessary. MONITORING i Hide as appropriate to the time horizon(s) of your action plan Estimates in 2020 Implementation Implementation Implementation Renewable Origin of the timeframe Status of cost spent so far cost Energy CO2 Key Actions Area of intervention Policy instrument Responsible body energy action implementation savings reduction production Start End € € MWh/a MWh/a t CO2/a MUNICIPAL BUILDINGS, EQUIPMENT/FACILITIES 9.645.620 24.709.860 113.901 27.000 43.093 G 1.1 EDV: Effizienzsteigerung durch Servervirtualisierung Energy efficient electrical appliances Energy management Local authority SG 12 2008 2011 Completed 80.000 80.000 47 28 G 1.2a EDV: Hosts abschalten, bzw. Betrieb in Minimallast Energy efficient electrical appliances Energy management Local authority SG 12 2012 2012 Completed 1.500 1.500 G 1.2b EDV: Stromsparende Kopierer & Telefone, Stromsparmodus Energy efficient electrical appliances Energy management Local authority SG 12 2005 Ongoing G 1.3 Innenbeleuchtung: Modernisierung Schule Nord Energy efficient lighting systems Building standards Local authority SG 45 2012 2014 Completed 20 12 G 1.4 Innenbeleuchtung: Modernisierung Schule Mitte Energy efficient lighting systems Building standards Local authority SG 45 2013 2014 Completed G 1.5 Klärwerk: Strombedarf senken (Modernisierungen Belüftung, Belebungsbecken..) Energy efficient electrical appliances Building standards Local authority SG 44 2007 2008 Completed 12.900 12.900 246 56 G 1.6a Veranstaltungsforum: effiziente Beleuchtung und Technik Energy efficient lighting systems Building standards Local authority Veranstaltungsforum 2005 Ongoing 53.000 108.000 33 20 G 1.6b Innenbeleuchtung: Umrüstung auf LED Energy efficient lighting systems Building standards Local authority SG 24, SG 45 2015 Ongoing G 1.6c Museum: Umrüstung auf LED Energy efficient lighting systems Building standards Local authority Museum 2012 2019 Ongoing 32.860 50.000 4 2 G 1.6d TG Buchenau: Umrüstung auf LED Energy efficient lighting systems Energy management Local authority SG 24 2016 2018 Ongoing 2.900 2 1 G 1.7 Bezug von Ökostrom (Strategisches Ziel 5) Other Energy management Local authority SG 24 2006 Ongoing 102.300 139.500 2.900 1.731 G 1.8 energetische Modernisierung: Analyse der Gebäude und "Ranking" Integrated action (all above) Energy management Local authority SG 24 und 45 2011 Ongoing 300.000 450.000 705 G 1.9 energetische Modernisierung: Schule Nord Integrated action (all above) Building standards Local authority SG 45 2010 2015 Completed 3.360.000 3.360.000 795 734 G 1.10 energetische Modernisierung: Schule Mitte (bzw. altes Graf-Rasso) Integrated action (all above) Building standards Local authority SG 45 2012 2014 Completed 2.925.000 2.925.000 70 103 1 von 7 Stand 23.Februar 2017
Konvent der Bürgermeister/innen - Monitoring 2017 Mitigation Actions MONITORING i Hide as appropriate to the time horizon(s) of your action plan Estimates in 2020 Implementation Implementation Implementation Renewable Origin of the timeframe Status of cost spent so far cost Energy CO2 Key Actions Area of intervention Policy instrument Responsible body energy action implementation savings reduction production Start End € € MWh/a MWh/a t CO2/a G 1.11 Energiemanagement: Energieleitfaden, Schulungen, Integrated action (all above) Energy management Local authority SG 24 2016 Ongoing Informationsveranstaltungen G 1.12 Energiemanagement: jährlicher Energiebericht Integrated action (all above) Energy management Local authority SG 24 2012 Ongoing G 1.13 Energiemanagement: Software-Tool Integrated action (all above) Energy management Local authority SG 24 2017 2017 Not started 10.000 100 G 1.14 Ausbau Einsatz von Gebäudeleittechnik in kommunalen Gebäuden Integrated action (all above) Energy management Local authority SG 24,Stadtwerke 2005 Ongoing 20.000 60.000 Energy efficiency in space heating and hot G 1.15 Klärwerk: Wärmeverbrauch senken (Erneuerung Öl-Heizkessel) Building standards Local authority SG 44 2008 2008 Completed 18.060 18.060 water Renewable energy for space heating and G 1.16 Fernwärme-Anschluss Doppelturnhalle Building standards Local authority SG 45 2012 2012 Completed 40.000 40.000 350 81 hot water Renewable energy for space heating and G 1.17 Fernwärme-Anschluss Grundschule und Hort West Building standards Local authority SG 45 2012 2012 Completed 770 179 hot water G 1.18 Neubau Krippe Sonnenplatz mit Wärmepumpe Integrated action (all above) Building standards Local authority SG 45 2012 2012 Completed 930.000 930.000 G 1.19 Sanierung Volkshochschule / Mehrgenerationenhaus Integrated action (all above) Building standards Local authority SG 45 2006 2010 Completed G 1.20 Energetische Modernisierung: Kindergarten Frühlingstraße Integrated action (all above) Building standards Local authority SG 45 2015 2017 Ongoing 1.770.000 1.770.000 345 115 G 1.21 Neubau am Sulzbogen: Passivhausstandard Integrated action (all above) Building standards Local authority SG 45 2014 2017 Ongoing 3.980.000 171 57 G 1.22 Neubau Parsevalstr.: Passivhausstandard Integrated action (all above) Building standards Local authority SG 45 2014 2018 Ongoing 2.145.000 30 10 G 1.23 Neubau und Umbau Rathaus: Nullenergiehaus, Integration Nutzeranforderung Integrated action (all above) Building standards Local authority SG 45, SG 16 2017 2022 Not started 850.000 366 122 bzgl Bedarf G 1.24 Erweiterung Schule Nord: Mittagsbetreuung, Passivhausstandard Integrated action (all above) Building standards Local authority SG 45, SG 11 2016 2019 Ongoing 560.000 41 11 G 1.25 Neubau beim Hochfeld Ost: Passivhaussiedlung Integrated action (all above) Building standards Local authority SG 45, SG 24 2017 2019 Not started 474 158 G 1.26 Wettbewerb Viehmarktplatz: Energiestandard, CarSharing, Baumaterial Integrated action (all above) Building standards Local authority SG 41, Klimaschutz 2017 Not started G 1.27 Energiestandard Sanierung: angestrebtes Ziel KfW 85 EnEV 2016 Integrated action (all above) Building standards Local authority SG 24, SG 45 2016 Ongoing 1.150 375 G 1.28 Energiestandard Neubau: angestrebtes Ziel Nullenergiehaus, bzw. Passivhaus Integrated action (all above) Building standards Local authority SG 45, SG 24 2016 Ongoing 350 72 G 1.29 Nutzung erneuerbare Energien: Mindestanteil ern. Energien (z.B. Photovoltaik, Renewable energy for space heating and Building standards Local authority SG 24, SG 45 2016 Ongoing Wärmepumpen) bei Heizungstausch, alt.Ersatzmaßnahmen hot water G 1.30 Leuchtturmprojekt: Plusenergiehaus (z.B. Hochfeld) Integrated action (all above) Building standards Local authority SG 45, Klimaschutz 2018 Not started G 1.31 Neubau / Sanierung: Kindergarten Nord mit PV Integrated action (all above) Building standards Local authority SG 45 2017 2019 Not started 7.217.000 265 51 Estimated reduction not associated with any reported actions 0 0 TERTIARY BUILDINGS, EQUIPMENT/FACILITIES 574.000 749.000 Energy efficiency in space heating and hot Other (national, G 2.1 Ausbau Einsatz von Gebäudeleittechnik Energy management Stadtwerke 2005 Ongoing water regional,…) Other (national, G 2.3 Neubau Berufsschule: Unterschreitung EnEV, PV-Anlage Integrated action (all above) Building standards LRA 2016 Ongoing 99 59 regional,…) Other (national, G 2.4 Energiemanagment LED Beleuchtung Leitwarte Auf der Lände Energy efficient lighting systems Energy management Stadtwerke 2016 2016 Completed 3.000 3.000 5 3 regional,…) Other (national, G 2.5 Energiemanagment Hallenbad: LED Beleuchtung und Lüftungsanlage Energy efficient lighting systems Energy management Stadtwerke 2015 2016 Completed 571.000 571.000 100 50 regional,…) Other (national, G 2.6 Neubau Stadtwerke: KfW 55, Gründach, Lichtsteuerung Integrated action (all above) Building standards Stadtwerke 2018 2019 Not started 175.000 83 120 regional,…) Estimated reduction not associated with any reported actions 0 0 RESIDENTIAL BUILDINGS 5.850.000 10.400.000 G 3.1 Renovierung Wohngebäude: Investitionen aus Förderung Gebäudesanierung und Bürger, SG 21, Integrated action (all above) Awareness raising / training Local authority 2008 2020 Ongoing 5.850.000 10.400.000 14.200 4.740 Steigerng Sanierungsrate aus Öffentlichkeitsarbeit Klimaschutz Estimated reduction not associated with any reported actions 0 0 PUBLIC LIGHTING 209.300 659.300 G 4.1 Umrüstung von HQL auf NAV Energy efficiency Energy management Local authority SG 44 2007 2015 Completed 200.000 200.000 513 306 G 4.2.a Evaluierung von LED- und Solarleuchten auf Teststrecken Energy efficiency Energy management Local authority SG 44, Stadtwerke 2007 2007 Completed 6.000 6.000 G 4.2.b Evaluierung von Induktionsleuchten auf Teststrecken Energy efficiency Energy management Local authority SG 44, Stadtwerke 2012 2012 Completed 3.300 3.300 2 von 7 Stand 23.Februar 2017
Konvent der Bürgermeister/innen - Monitoring 2017 Mitigation Actions MONITORING i Hide as appropriate to the time horizon(s) of your action plan Estimates in 2020 Implementation Implementation Implementation Renewable Origin of the timeframe Status of cost spent so far cost Energy CO2 Key Actions Area of intervention Policy instrument Responsible body energy action implementation savings reduction production Start End € € MWh/a MWh/a t CO2/a G 4.3 weitere Umrüstung von NAV z.B. auf LED (Machbarkeitsstudie, sukzessive Energy efficiency Energy management Local authority SG 44 2012 2020 Ongoing 450.000 800 478 Umrüstung und Neubau) Energy suppliers G 4.4 Bezug von Ökostrom (Strategisches Ziel 5) Integrated renewable power Local authority SG 24 2006 Ongoing 793 473 obligations Estimated reduction not associated with any reported actions 0 0 INDUSTRY Estimated reduction not associated with any reported actions 90.099 25.781 32.142 TRANSPORT 1.530.140 5.232.310 29.959 0 8.877 V 1.1 Information Spritsparendes Fahren als Teil der Dienstanweisung Fahrzeugnutzung Eco-driving Awareness raising/training Local authority SG 16 2005 Ongoing V 1.2 Dienstanweisung: Dienstfahrten und -reisen mit dem ÖPNV, bzw. der Bahn ( Modal shift to public transport Public procurement kommunale Fahrzeugflotte Local authority SG 16 2016 2016 Completed Grundsatz der allg. Genehmigung) V 1.3 Beteiligung an "Mit dem Rad zur Arbeit" Modal shift to walking & cycling Awareness raising/training Local authority SG 13 2006 Ongoing 5.040 6.720 V 1.4 Anschaffung Elektroauto Electric vehicles (incl. infrastructure) Public procurement Local authority SG 16 2017 2020 Not started 11.340 4 1 V 1.5 schrittweise Umstellung der PKWs auf Elektro/Erdgas/CO2-sparend Cleaner/efficient vehicles Public procurement Local authority SG 16 2013 Ongoing 12.600 25.100 2 V 1.6 Einbindung Fahrzeugflotte in Carsharingsystem, Carsharing-Parkplatz auf SG 41 (VP), SG 16, SG Car sharing/pooling Public procurement Local authority 2016 2018 Ongoing Rathausgelände, bzw. in unmittelbarer Nähe 32 SG 16, SG 24, SG V 1.7 Elektrotankstelle auf Rathausgelände, bzw. in unmittelbarer Nähe Electric vehicles (incl. infrastructure) Public procurement Local authority 2016 2018 Ongoing 41(VP), SG 32 SG 41 (VP),Fahrrad, SG V 1.8 Pedelec-Tankstelle auf Rathausgelände, bzw. in unmittelbarer Nähe Electric vehicles (incl. infrastructure) Public procurement Local authority 2018 2018 Not started 5.000 16, SG 32 Transport / mobility V 2.1 Stärkung Angebote Busverkehr: Taktverdichtung, Markierungskosten Modal shift to public transport Local authority SG 32 2005 Ongoing 600.000 800.000 planning regulation Transport / mobility Other (national, V 2.2 "CO2-sparende Busse" im Stadtgebiet - Leuchtturmprojekt Cleaner/efficient vehicles LRA 2015 Ongoing 680.000 47 ÖPNV planning regulation regional,…) V 2.4 Bushaltestellen mit PV-Anlage (z.B. Nutzung für Elektrotankstelle, autarke Other Other Local authority SG 44 2017 2017 Not started 5.000 Beleuchtung) Transport / mobility V 2.5 Umstellung Schülerbeförderung auf ÖPNV Modal shift to public transport Local authority SG 32 2017 Not started planning regulation Transport / mobility Fahrrad, SG 41 (VP), SG V 3.1 Maßnahmen zur Förderung des Radverkehrs (baulich etc.) Modal shift to walking & cycling Local authority 2012 Ongoing 10.600 2.750 planning regulation 44, SG 32 V 3.1.a Umgestaltung beim Landratsamt & Planung Verbesserung Rad/Fußverkehr Transport / mobility Fahrrad, SG 41 (VP), SG Road network optimisation Local authority 2016 2018 Ongoing 215.000 Münchner Straße (s. RP 2.2), inkl. Busbucht planning regulation 44, SG 32 Transport / mobility Fahrrad, SG 41 (VP), SG V 3.1.b neuer Radweg Augsburger Straße Road network optimisation Local authority 2016 2017 Ongoing 18.000 330.000 planning regulation 44, SG 32 V 3.1.c Waschstraße Geh-/Radwege (zw. Malchinger - und Augsburger Str., Transport / mobility Fahrrad, SG 41 (VP), SG Road network optimisation Local authority 2013 2014 Completed 97.000 97.000 abgeschlossen) planning regulation 44, SG 32 Transport / mobility Fahrrad, SG 41 (VP), SG V 3.1.d neuer Radweg und Querungshilfe Schöngeisingerstr./ Landsbergerstraße Road network optimisation Local authority 2014 2016 Ongoing 189.500 262.000 planning regulation 44, SG 32 Transport / mobility V 3.1.e Sanierung der Bestandsradwege Road network optimisation Local authority SG 44, Fahrrad 2014 Ongoing 45.000 105.000 planning regulation Transport / mobility V 3.1.f Anordnung und Sanierung der Fahrbahnmarkierungen Road network optimisation Local authority SG 32, Fahrrad, SG 44 2014 Ongoing 7.500 17.500 planning regulation Transport / mobility SG 32, Fahrrad, SG 41 V 3.1.g Überprüfung und Umsetzung Radwegbenutzungspflicht Modal shift to walking & cycling Local authority 2012 2017 Ongoing 12.500 15.000 planning regulation (VP), SG 44 Radverkehr Transport / mobility Fahrrad, SG 41 (VP), SG V 3.1.h Querungshilfen Road network optimisation Local authority 2018 2018 Not started 31.000 planning regulation 44, SG 32 Transport / mobility V 3.1.i Radabstellanlagen Buchenau Modal shift to walking & cycling Local authority SG 44, Fahrrad 2015 Ongoing 10.000 30.000 planning regulation Transport / mobility Fahrrad, SG 41 (VP), SG V 3.1.k Fahrradverleihsystem Modal shift to walking & cycling Local authority 2016 Ongoing 16.650 157.000 planning regulation 44, SG 32 Fahrrad, SG 41 (VP), SG V 3.1.l Fahrradkarte Modal shift to walking & cycling Awareness raising/training Local authority 2015 2015 Completed 5.750 5.750 44, SG 32 Fahrrad, SG 41 (VP), SG V 3.1.m Arbeitsgemeinschaft Fahrradfreundliche Kommune Modal shift to walking & cycling Awareness raising/training Local authority 2015 Ongoing 4.000 12.000 44, SG 32 Fahrrad, SG 41 (VP), SG V 3.1.n Beschilderung Radrouten Modal shift to walking & cycling Awareness raising/training Local authority 2017 Not started 70.000 44, SG 32 Fahrrad, SG 41 (VP), SG V 3.1.o Ammer-Amper-Radweg & Landkreis Radkarte Modal shift to walking & cycling Awareness raising/training Local authority 2015 Ongoing 1.200 3.600 44, SG 32 V 3.1.p Einstellung Fahrradbeauftragte Modal shift to walking & cycling Other Local authority SG 13 2014 Ongoing 142.500 280.000 Transport / mobility Fahrrad, SG 41 (VP), SG V 3.1.q St 2054, Verlängerung Augsburger Straße, Am Ährenfeld bis Kreisverkehr Road network optimisation Local authority 2017 2018 Not started planning regulation 44 Fahrrad, SG 41 (VP), SG V 3.1.r Radl-Sicherheitscheck Modal shift to walking & cycling Awareness raising/training Local authority 2016 Ongoing 2.500 12.500 32 3 von 7 Stand 23.Februar 2017
Konvent der Bürgermeister/innen - Monitoring 2017 Mitigation Actions MONITORING i Hide as appropriate to the time horizon(s) of your action plan Estimates in 2020 Implementation Implementation Implementation Renewable Origin of the timeframe Status of cost spent so far cost Energy CO2 Key Actions Area of intervention Policy instrument Responsible body energy action implementation savings reduction production Start End € € MWh/a MWh/a t CO2/a Transport / mobility V 3.1.s Radweg Biburg-Gelbenholzen Road network optimisation Local authority SG 44, Fahrrad 2016 2017 Ongoing 23.400 453.800 planning regulation Transport / mobility Fahrrad, SG 41 (VP), SG V 3.1.t Neubau "Am Sulzbogen" inkl. Radfahrer-Schutzstreifen Road network optimisation Local authority 2016 2018 Ongoing 980.000 planning regulation 44 Transport / mobility Other (national, V 3.1.u Radwegekonzept Landkreis FFB Road network optimisation LRA 2016 2018 Ongoing 10.000 Radverkehr planning regulation regional,…) V 3.1.v Straßenzug Oskar-von-Miller-Straße / Fürstenfelder Straße / Schöngeisinger Transport / mobility SG 41 (VP), Fahrrad, SG Road network optimisation Local authority 2017 2018 Not started Straße planning regulation 44 Transport / mobility SG 41 (VP), Fahrrad, SG V 3.1.w Dauerzählstelle Fuß- und Radverkehr inkl. Display Modal shift to walking & cycling Local authority 2017 2017 Not started 20.000 planning regulation 44 V 3.2 Beteiligung am "Stadtradeln" Modal shift to walking & cycling Awareness raising/training Local authority Fahrrad, SG 14 ÖA 2012 Ongoing 3.000 6.000 Transport / mobility V 3.4 Fußweg Haupstraße - Viehmarktplatz Modal shift to walking & cycling Local authority SG 44 2015 2015 Completed 142.000 142.000 planning regulation Other (national, V 3.5 Aktionstag Elektromobilität, bzw. jährliche Veranstaltung rund um Energie Electric vehicles (incl. infrastructure) Awareness raising/training Stadtwerke 2011 Ongoing 102.000 170.000 regional,…) Other (national, V 3.6 Stadtwerke: Anschaffung Elektro und Erdgasautos Electric vehicles (incl. infrastructure) Other Stadtwerke 2011 2016 Completed 82.000 82.000 regional,…) Integrated ticketing and Other (national, V 3.7 Ladesäule für Auto und Pedelec, Beteiligung an ladenetz.de Electric vehicles (incl. infrastructure) Stadtwerke 2011 2016 Completed 8.000 8.000 charging regional,…) Other (national, V 3.8 Berücksichtigung von Ladeinfrastruktur bei Straßen-/Infrastrukturarbeiten Electric vehicles (incl. infrastructure) Other Stadtwerke 2012 Ongoing regional,…) V 3.9 Anregung im Rahmen des LK-Klimaschutzkonzepts: Maßnahmen wie CarSharing, Other (national, Other Other Klimaschutz 2012 Ongoing Informationszentrale Mobilität, Ausbau Radwegenetz regional,…) Transport / mobility V 3.10 Elektrotankstellen im Stadtgebiet Electric vehicles (incl. infrastructure) Local authority SG 41 (VP), SG 32 2016 Ongoing planning regulation Mobilität SG 41 (VP), SG 32, SG V 3.11 Elektromobilitätskonzept / CarSharing Car sharing/pooling Other Local authority 2016 Ongoing 99.000 900 240 16 SG 32, SG 41(VP), SG V 3.12 Vergünstigungen für Elektromobilität: z.B. zusätzliche Stellplätze, etc. Electric vehicles (incl. infrastructure) Grants and subsidies Local authority 2016 Ongoing 44 SG 41 (VP), Stadtwerke, V 3.13 Teilnahme an der Aktion ERUDA Electric vehicles (incl. infrastructure) Awareness raising/training Local authority 2015 Ongoing Ziel 21 SG 41 (VP), SG 16, SG V 3.14 Einführung Carsharing Car sharing/pooling Other Local authority 2017 2019 Not started 570 151 32 SG 41 (VP), Fahrrad, SG V 3.15 Mobilitätsstationen: Fahrradverleih, Carsharing, Elektrotankstelle, Pedelec Other Other Local authority 2018 Not started 75.000 32, SG 44, Klimaschutz V 3.16 Mobilitätsmanagement: Kinder- und Jugendmobilität (2017/18), weitere SG 41 (VP) Fahrrad, SG Modal shift to walking & cycling Awareness raising/training Local authority 2017 Not started 10.000 Maßnahmen wie z.B. betriebliches Mobilitätsmanagement in den Folgejahren 32 Transport / mobility V 3.17 Tempo 30-Zonen Eco-driving Local authority SG 32 2016 2020 Ongoing 1.450 380 planning regulation Estimated reduction not associated with any reported actions 0 0 16.436 0 5.307 LOCAL ELECTRICITY PRODUCTION 1.730.600 1.810.800 0 24.700 14.746 S 3.1 Photovoltaik auf kommunalen Dächern: Schule Nord, Jahnhalle Photovoltaics Third party financing. PPP Local authority SG 24, Stadtwerke 2011 2011 Completed 466.000 466.000 153 91 S 3.2 Solarkataster Photovoltaics Awareness raising / training Local authority Klimaschutz 2011 2011 Completed 15.600 15.600 4.400 2.650 S 3.3 a Photovoltaik auf kommunalen Dächern: Schulzentrum West Photovoltaics Third party financing. PPP Local authority SG 24, Stadtwerke 2012 2012 Completed 86.000 86.000 30 18 S 3.3 b Photovoltaik auf kommunalen Dächern: KiGa Frühlingsstr. Photovoltaics Public procurement Local authority SG 45 2016 2017 Ongoing 47 28 Other (national, Photovoltaik S 3.4 Photovoltaik auf Einrichtungen des Landkreises im Stadtgebiet Photovoltaics Public procurement LRA 2008 Ongoing 237 141 regional,…) Other (national, S 3.5 Photovoltaik auf Energiezentrale West Photovoltaics Third party financing. PPP Stadtwerke 2008 2008 Completed 182.000 182.000 23 14 regional,…) S 3.6 Photovoltaik auf kommunalen Dächern: Schule Mitte Photovoltaics Public procurement Local authority SG 45 2016 2017 Ongoing 30 18 S 3.7 Photovoltaik auf kommunalen Dächern Photovoltaics Public procurement Local authority SG 24, SG 45 2005 Ongoing 60 36 Other (national, S 3.8 Solarkataster: Neueinführung mit Landkreis Photovoltaics Public procurement LRA 2018 2018 Not started 5.200 2.100 1.250 regional,…) S 3.9 Umstellung Parkscheinautoamten auf solar Photovoltaics Public procurement Local authority SG 32 2016 2017 Ongoing Other (national, S 3.10 Stadtwerke Neubau: PV-Anlage Photovoltaics Other Stadtwerke 2018 2018 Not started 65.000 30 19 regional,…) Other (national, S 4.1 Biomethan-BHKW, 6,7 GWh (Auf der Lände) Combined Heat and Power Other Stadtwerke 2011 2011 Completed 6.700 4.000 regional,…) KWK S 4.2 Klärwerk: Ausbau BHKW-Module (Klärgas) Combined Heat and Power Public procurement Local authority SG 44 2012 2012 Completed 521.000 521.000 2.602 1.550 Other (national, S 4.3 Energiezentrale West: neues BHKW Combined Heat and Power Other Stadtwerke 2014 2014 Completed 460.000 460.000 2.300 460 regional,…) 4 von 7 Stand 23.Februar 2017
Konvent der Bürgermeister/innen - Monitoring 2017 Mitigation Actions MONITORING i Hide as appropriate to the time horizon(s) of your action plan Estimates in 2020 Implementation Implementation Implementation Renewable Origin of the timeframe Status of cost spent so far cost Energy CO2 Key Actions Area of intervention Policy instrument Responsible body energy action implementation savings reduction production Start End € € MWh/a MWh/a t CO2/a S 5.1 Öko- Stromtarif-Aufschlag "FFBNaturStrom": 100 % Wasserkraftstrom, Aufschlag Energy suppliers Other (national, Other Stadtwerke 2011 Ongoing investiert in reg. Energieerzeugungsanlagen obligations regional,…) S 5.2 Marktbeobachtung zu Pilotprojekten für Smart Grids / Smart Metering / Speicher Other (national, Other Other Stadtwerke 2005 Ongoing und Methanisierung (Power to Gas) regional,…) Sonstige S 5.3 Energieatlas Bayern: Integration erneuerbarer Energien und Aktivitäten Other Awareness raising / training Local authority Klimaschutz 2014 Ongoing S 5.4 Fliegerhorst: Konzept zur Nutzung alternativer Methoden der Energiegewinnung Other Land use planning Local authority Konversion, Klimaschutz 2017 2018 Not started 10.000 Energy suppliers Other (national, S 5.6 100% Ökostrom für Kunden der Stadtwerke FFB Other Stadtwerke 2016 2016 Completed 11.175 5.800 obligations regional,…) Estimated reduction not associated with any reported actions 0 0 0 -5.187 -1.329 LOCAL HEAT/COLD PRODUCTION 421.000 1.441.000 0 68.000 9.995 Other (national, W 1.1 Heizkraftwerk "Auf der Lände": neues BHKW-Modul mit Bio-Erdgas (s.o.) District heating/cooling plant Other Stadtwerke 2011 2011 Completed 7.000 1.519 regional,…) KWK Other (national, W 1.3 Energiezentrale West: neues BHKW (s.o.) District heating/cooling plant Other Stadtwerke 2014 2014 Completed 3.000 regional,…) Other (national, W 1.4 BHKW Sparkasse: Erneuerung der Motoren Combined Heat and Power Other Stadtwerke 2018 2018 Not started 200.000 regional,…) Other (national, W 2.1 Energiezentrale West: neues Heizwerk, mit Holzhackschnitzeln District heating/cooling plant Other Stadtwerke 2007 2007 Completed 16.100 2.945 Fernwärme regional,…) W 2.2 Energiezentrale West: Holzhackschnitzel aus kommunalem Baum- und Other (national, District heating/cooling plant Other Stadtwerke, SG 23 2008 2016 Completed Strauchschnitt regional,…) W 2.3 Fliegerhorst: Prüfung bestehende Fernwärmekraftwerke District heating/cooling plant Other Local authority Konversion, Stadtwerke 2017 2018 Not started 20.000 District heating/cooling network (new, Other (national, W 3.1 Ausbau Fernwärmenetz West Other Stadtwerke 2011 2016 Completed 91.000 91.000 7.400 304 expansion, refurbishment) regional,…) District heating/cooling network (new, Other (national, W 3.2 Verbindungsleitung zwischen den beiden Netzen Other Stadtwerke 2018 2018 Not started 800.000 expansion, refurbishment) regional,…) Netzausbau District heating/cooling network (new, Other (national, W 3.3 Ausbau Fernwärmenetz Innenstadt: Konrad-Adenauer-Straße Other Stadtwerke 2012 2012 Completed expansion, refurbishment) regional,…) District heating/cooling network (new, Other (national, W 3.4 Ausbau Fernwärmenetz Innenstadt: Ludwigstraße, Pucherstraße Other Stadtwerke 2012 2012 Completed expansion, refurbishment) regional,…) District heating/cooling network (new, Other (national, W 3.5 Netzausbau Fernwärme für neue Baugebiete und Erschließung Bestand Other Stadtwerke, SG 41 2005 Ongoing expansion, refurbishment) regional,…) District heating/cooling network (new, Other (national, W 3.6 Ausbau Fernwärmenetz Innenstadt Other Stadtwerke 2016 2016 Ongoing 330.000 330.000 8.049 330 expansion, refurbishment) regional,…) Other (national, regional,…) 0 0 0 26.451 4.897 URBAN PLANNING 180.000 1.075.500 0 0 0 SG 42, SG 41, RP 1.1 Städtebauliche Verträge: Energiestandards und Energiekonzept festlegen Other Land use planning Local authority 2015 Ongoing Klimaschutz, SG 43 RP 1.2 Hochfeld West: Fernwärme-Anschlusszwang Other Land use planning Local authority SG 41 2011 2013 Completed 50 23 RP 1.3 Ausbau Baugebiet Krebsenbach: innovative Konzepte Other Land use planning Local authority SG 41, Klimaschutz 2014 2018 Ongoing 55.000 450 205 RP 1.4 Prüfung Ausweisung Sanierungsgebiete Urban regeneration Land use planning Local authority SG 41 2005 Ongoing RP 1.5 Hochfeld Ost: Schaffung planungsrechtlicher Voraussetzungen für Errichtung Other Land use planning Local authority SG 41, Klimaschutz 2018 Not started 40.000 770 350 einer Solarsiedlung mit Plusenergiehäusern Strategische Raumplanung RP 1.6 Festlegung von Energiestandards bei der Veräußerungen von kommunalen SG 21, SG 41, Other Land use planning Local authority 2015 Ongoing Flächen Klimaschutz RP 1.7 Baugebiet Alter Sportplatz Graf-Rasso: Energiestandards, Carsharing- Other Land use planning Local authority SG 41, Klimaschutz 2013 2016 Completed 74 34 Stellplätze, Elektrotankstelle RP 1.8 Baugebiet Cerveteriestraße-West: Integration Klimaschutz und innovative Other Land use planning Local authority SG 41, Klimaschutz 2017 Not started 10.000 75 34 Konzepte RP 1.9 Baugebiet Unfaltstraße: Integration Klimaschutz und innovative Konzepte Other Land use planning Local authority SG 41, Klimaschutz 2016 2018 Ongoing 5.000 58 26 RP 1.10 Baugebiet Aumühle: Integration Klimaschutz und innovative Konzepte Other Land use planning Local authority SG 41, Klimaschutz 2017 2019 Not started 17.500 31 14 RP 1.11 Baugebiet Neulindach / Grimm: Integration Klimaschutz und innovative Other Land use planning Local authority SG 41, Klimaschutz 2016 2019 Ongoing 20.000 216 97 Konzepte RP 1.12 Baugebiet Hubertusstr.: Integration Klimaschutz und innovative Konzepte Other Land use planning Local authority SG 41, Klimaschutz 2017 2019 Not started 5.000 51 23 RP 1.13 Baugebiet Marktplatz Ost: Integration Klimaschutz und innovative Konzepte Other Land use planning Local authority SG 41, Klimaschutz 2017 2017 Not started 67 30 RP 1.14 Fliegerhorst: Schaffung von Voraussetzungen für energieeffiziente Other Land use planning Local authority Konversion, Klimaschutz 2017 2017 Not started 10.000 Siedlungskonzepte (Ideenwettbewerb anteilig) Konversion, SG 24/45, RP 1.15 Fliegerhorst: Versuchshäuser mit alternativer Energieerzeugung Other Land use planning Local authority 2020 Not started Klimaschutz 5 von 7 Stand 23.Februar 2017
Konvent der Bürgermeister/innen - Monitoring 2017 Mitigation Actions MONITORING i Hide as appropriate to the time horizon(s) of your action plan Estimates in 2020 Implementation Implementation Implementation Renewable Origin of the timeframe Status of cost spent so far cost Energy CO2 Key Actions Area of intervention Policy instrument Responsible body energy action implementation savings reduction production Start End € € MWh/a MWh/a t CO2/a RP 1.16 Fliegerhorst: Nutzung der Grauen Energie im Baubestand, Entwicklung von Raumplanun Waste & wastewater management Land use planning Local authority Konversion, Klimaschutz 2015 2018 Ongoing 100.000 Standards RP 1.17 Stellungnahmen zu Bauvorhaben & Raumplanung bezüglich Klimarelevanz Other Land use planning Local authority Klimaschutz 2015 Ongoing Verkehr / Mobilität RP 1.18 Fliegerhorst: Untersuchung der Einsparmaßnahmen durch Suffizienz Other Land use planning Local authority Konversion, Klimaschutz 2017 2018 Not started 50.000 RP 2.1 Gutachten und Planungsmaßnahmen Verkehr Other Land use planning Local authority SG 41 (VP) 2005 Ongoing 180.000 240.000 g RP 2.1 .a Großer Perspektivkreis Verkehr, Runder Tisch Radverkehr, Kleiner Other Awareness raising / training Local authority SG 41 (VP), Fahrrad 2010 Ongoing Perspektivkreis CarSharing RP 2.3 Städtebauliche Verträge und Veräußerung kommunaler Liegenschaften: Mobilitätskonzepte SG 42, SG 21, SG 41 (VP) Other Land use planning Local authority 2017 Not started 120.000 inkl. Carsharing und Elektrotankstellen, Stellplatzschlüssel SG 43 RP 2.4 Verkehrsentwicklungsplan inkl. Fliegerhorst Other Land use planning Local authority SG 41 (VP) 2017 Not started 403.000 RP 3.1 Konzept und Stadtratsbeschluss Other Land use planning Local authority Klimaschutz 2016 2016 Completed Standards RP 3.2 Hinweise zu Energieeinsparung und Klimaschutz bei Bauanträge Other Awareness raising / training Local authority SG 43, Klimaschutz 2015 Ongoing RP 3.3 Baurecht: Abweichungen zu Gunsten Energiebilanz (soweit städtebaulich SG 43, SG 41, Other Land use planning Local authority 2016 Ongoing vertretbar) abwägen Klimaschutz Estimated reduction not associated with any reported actions 0 0 -1.842 0 -835 PUBLIC PROCUREMENT 0 12.000 0 0 0 Effizenz & Graue Energie ÖB 1.1 Allgemein: schrittweise Umstellung auf energieeffiziente Geräte Other Other Local authority SG 16 2005 Ongoing ÖB 1.3 Berücksichtigung der Grauen Energie bei Bauvorhaben: Baustoffe und Waste & wastewater management Other Local authority SG 24, SG 45 2015 Ongoing Baukonstruktionen (z.B. Vergabe besondere Beratungsleistung) ÖB 1.5 Vergaberecht: Berücksichtigung der Klimaschutzaspekte Other Other Local authority SG 16 2017 Not started ÖB 1.6 Projekt "Brucker Becher - Coffee to go again" Waste & wastewater management Awareness raising / training Local authority SG 14, Stadtmarketing 2017 2017 Not started 12.000 EE ÖB 2.1 Sanierung / Neubau möglichst mit Photovoltaik, Fernwärme, Wärmepumpen, etc. Other Other Local authority SG 45 2005 Ongoing Estimated reduction not associated with any reported actions 0 0 0 0 0 OTHERS 1.174.800 2.076.500 0 0 0 ÖA 1. Budget Öffentlichkeitsarbeit "Klimaschutz und Energiewende" Other Awareness raising / training Local authority Klimaschutz, SG 14 ÖA 2011 Ongoing 125.000 250.000 Other (national, ÖA 1.1 Energieberatung durch ZIEL 21 und Stadtwerke (Bürger/innen, Unternehmen) Other Awareness raising / training ZIEL 21, Stadtwerke 2005 Ongoing regional,…) ÖA 1.2 Beteiligung an jährlichen Energietagen Fürstenfeldbruck Other Awareness raising / training Local authority Stadtwerke, Klimaschutz 2007 Ongoing 150.000 210.000 ÖA 1.3 Öffentliche Informationsveranstaltungen zu Energienutzungsplan, Aktionsplan Other Awareness raising / training Local authority Klimaschutz 2010 Ongoing etc. ÖA 1.4 Internet-Radportal Other Awareness raising / training Local authority SG 41 2012 2012 Completed 2.000 2.000 ÖA 1.5 Internet-Energieportal rund um Energie (inkl. Mobilität) Other Awareness raising / training Local authority Klimaschutz, Stadtwerke 2011 2012 Completed 4.800 4.800 ÖA 1.6 Gebäudesanierung: Informationsveranstaltungen in Quartieren mit hohem Other Awareness raising / training Local authority Klimaschutz 2013 Ongoing Öffentlichkeitsarbeit Potenzial, z.B. Energiekaravane ÖA 1.7 Photovoltaik: Informationsveranstaltungen in Quartieren mit hohem Potenzial Other Awareness raising / training Local authority Klimaschutz, Ziel 21 2019 Not started ÖA 1.8 Bauherrenmappe: Überarbeitung Other Awareness raising / training Local authority Klimaschutz 2016 2017 Not started ÖA 1.9 Energiespar-Flyer: Überarbeitung Other Awareness raising / training Local authority Klimaschutz, SG 14 ÖA 2017 2017 Not started ÖÄ 1.10 Programm ÖKOPROFIT Other Awareness raising / training Local authority Klimaschutz 2018 2019 Not started ÖÄ 1.11 Einstellung Klimaschutzbeauftrage/r Other Awareness raising / training Local authority SG 13, Stadtwerke 2009 Ongoing 456.000 702.000 Other (national, ÖA 1.12 Verleihung Strommessgeräte Other Awareness raising / training Stadtwerke 2005 Ongoing regional,…) ÖA 1.13 Internet Klimaschutz-Portal: Integration Solar- und Energieportal, Erweiterung Other Awareness raising / training Local authority Klimaschutz, SG 14 ÖA 2017 2018 Ongoing 15.000 Bürgerbeteiligung, Veranstaltungen ÖA 1.14 Erstellung eines Klimaschutzleitfadens (z.B. Sammlung zu Energieeinsparung, Other Awareness raising / training Local authority Klimaschutz, SG 14 ÖA 2015 2018 Ongoing grauer Energie, Förderprogramme) ÖA 1.15 Stadtratsbeschlüsse: Prüfen auf Klimaschutzrelevanz Other Awareness raising / training Local authority Rathaus, Klimaschutz 2011 Ongoing ÖA 1.16 Brucker Musterhaus: Aktion zur Förderung der Gebäudesanierung Other Awareness raising / training Local authority Klimaschutz 2015 2015 Completed 6 von 7 Stand 23.Februar 2017
Konvent der Bürgermeister/innen - Monitoring 2017 Mitigation Actions MONITORING i Hide as appropriate to the time horizon(s) of your action plan Estimates in 2020 Implementation Implementation Implementation Renewable Origin of the timeframe Status of cost spent so far cost Energy CO2 Key Actions Area of intervention Policy instrument Responsible body energy action implementation savings reduction production Start End € € MWh/a MWh/a t CO2/a ÖA 1.17 Sanierungsratgeber: Kennwerte aus Förderprogramm, allg. Informationen Other Awareness raising / training Local authority Klimaschutz 2017 2018 Not started ÖA ÖA 1.18 Internet-Mobilitätsportal Other Awareness raising / training Local authority SG 41 (VP), Fahrrad 2016 2017 Ongoing 21.000 Other (national, ÖA 2.1 Heizungspumpentausch Other Awareness raising / training Freistaat Bayern 2016 Ongoing 500 299 regional,…) ÖA 2.3 Förderprogramm Gebäudesanierung Other Other Local authority SG 21, Klimaschutz 2008 Ongoing 400.000 650.000 5.700 1.900 Finanzielle Unterstützung ÖA 2.4 Förderprogramm Gebäudesanierung: Anpassung, Überarbeitung, Other Other Local authority SG 21, Klimaschutz 2017 2017 Not started Nutzungsrecht Daten (Bedarf vorher/nachher), Ergänzung ÖA 2.5 Förderprogramm Gebäudesanierung: Erweiterung Heizungstechnik (z.B. auf Other Other Local authority SG 21, Klimaschutz 2017 Not started 100.000 900 300 Heizungssteuerung und Lüftungsanlagen) Other (national, ÖA 2.6 Förderprogramm Elektromobilität Other Other Stadtwerke 2011 2016 Completed 10.000 10.000 regional,…) ÖA 2.7 Förderprogramm Gebäudesanierung: Erweiterung z.B. Energieberatung Other Other Local authority SG 21, Klimaschutz 2019 Not started 50.000 450 150 ÖA 2.8 Förderprogramme von Bund und Land: Informationen über Aktionen und Other Other Local authority Klimaschutz 2015 Ongoing Programme, z.B. 10.000 Häuser, KfW, Bafa ÖA 2.9 Akquise Fördergelder für kommunale Klimaschutzprojekte Other Other Local authority Klimaschutz, SG 21 2015 Ongoing ÖA 2.10 Bewerbung für Auszeichnungen von Klimaschutzprojekten in FFB: z.B. Other Awareness raising / training Local authority Klimaschutz 2015 Ongoing bayerischer Umweltpreis Other (national, ÖA 3.1 ergänzender Umweltunterricht zu Energie und Wasser Other Awareness raising / training Stadtwerke 2009 Ongoing 21.000 36.000 regional,…) ÖA 3.2 monatliche Information im RathausReport ("Energiewende-Seite") Other Awareness raising / training Local authority Klimaschutz, SG 14 ÖA 2011 Ongoing 6.000 6.000 ÖA 3.3 Schaukasten im Rathaus zu Klimaschutz und Energiewende Other Awareness raising / training Local authority Klimaschutz 2011 Ongoing ÖA 3.4 Energie-Stammtisch, "zu Gast" bei bestehenden Stammtischen Other Awareness raising / training Local authority Klimaschutz 2018 Not started ÖA 3.5 Aktionen zu verschiedenen Energiethemen, z. B. effiziente Geräte Other Awareness raising / training Local authority Klimaschutz 2011 Ongoing ÖA 3.6 Beteiligung an Earth Hour Other Awareness raising / training Local authority Klimaschutz 2011 Ongoing ÖA 3.7 Stadtinformationsbroschüre etc.: Integration Energiethemen bei Überarbeitung Other Awareness raising / training Local authority Klimaschutz, SG 14 ÖA 2013 Ongoing ÖA 3.8 Ehrung von Bürger/innen, Unternehmen, Einrichtungen etc., bei Wirtschafts- Klimaschutz, Other Awareness raising / training Local authority 2018 Not started /Neujahrsempfang, eventuell in Verbindung mit Preisen Wirtschaftsförderung Other (national, Sensibilisierung und lokale Netzwerke ÖA 3.9 Stromrechnung mit ausführlicherer Information Other Awareness raising / training Stadtwerke 2013 Ongoing regional,…) ÖA 3.10 Forschungsprojekt mit TU München: Wie kann man Hauseigentümer zum Other Other Local authority Klimaschutz, SG 14 ÖA 2018 Postponed Sanieren motivieren ÖA 3.11 Monitoring Klimaschutzmaßnahmen Other Other Local authority Klimaschutz 2014 Ongoing ÖA 3.12 Mitgliedsporträt Klimabündnis Other Awareness raising / training Local authority Klimaschutz 2016 2016 Completed ÖA 3.13 CO2-Bilanz Stadt FFB Other Other Local authority Klimaschutz 2016 2017 Completed 17.000 SG 24, Klimaschutz, SG ÖA 3.14 Veröffentlichung eines Energieberichts Other Awareness raising / training Local authority 2018 2018 Not started 14 ÖA Klimaschutz, SG 14 ÖA, ÖA 3.15 Ausstellungen im Rathaus zu Themen des Klimaschutzes Other Awareness raising / training Local authority 2015 Ongoing SG 16 ÖA 3.16 Auslobung Bauherren Sonderpreis für energetische Sanierung / nachhaltigen Other Awareness raising / training Local authority SG 43, Klimaschutz 2017 Not started Neubau Other (national, ÖA 3.17 PV-Kampagne Other Awareness raising / training Ziel 21 2015 Ongoing regional,…) ÖA 3.18 Vortragsreihe Klimaschutz Other Awareness raising / training Local authority Klimaschutz, SG 14 ÖA 2015 Ongoing ÖA 3.19 Aktionen in Schulen: Klimadetektive Other Awareness raising / training Local authority Klimaschutz, SG 14 ÖA 2015 Ongoing ÖA 3.20 Teilnahme bayerische Klimaschutzwoche: Aktionen, Veranstaltungen Other Awareness raising / training Local authority Klimaschutz, SG 14 ÖA 2015 Ongoing ÖA 3.21 Projekte zur Steigerung des Bewusstseins für Klimaschutz: Autofreier Tag, Other Awareness raising / training Local authority Klimaschutz, SG 14 ÖA 2016 Ongoing Reduzierung Plastik, Regionale Lebensmittel Wirtschaftsförderung, ÖA 3.22 Klimaschutz in der Wirtschaftsförderung: Infoveranstaltung zu Energieeffizienz Other Awareness raising / training Local authority 2018 Not started 2.500 Klimaschutz, SG 14 ÖA ÖA 3.23 Gründung eines Klimapaktes: Zusammenschluss lokaler Vertreter Klimaschutz, SG 14 ÖA, Other Awareness raising / training Local authority 2018 Not started (Unternehmer, Institutionen, Einrichtungen) für den Klimaschutz Wirtschaftsförderung, ÖA 3.24 Thermografierundgände zur Förderung der Gebäudesanierung Other Awareness raising / training Local authority Klimaschutz, LRA 2017 Not started 200 Estimated reduction not associated with any reported actions 0 0 -7.550 0 -2.649 TOTAL 21.315.460 48.166.270 143.860 119.700 76.711 7 von 7 Stand 23.Februar 2017