anlage7-1visa-untersttzungsschreibentesla-geschwrztmwae

Dieses Dokument ist Teil der Anfrage „Korrespondenz mit Tesla Inc. (seit 02/2022)

/ 40
PDF herunterladen
ET VERBERET if RED
| — — | rm Tesla Manufacturing Brandenburg SE
ZT Tesla Straße 1

15537 Grünheide (Mark)

Germany

Registration Court Frankfurt/Oder, HRB 18107
Geschäftsführender Direktor; Stephan Werknian
Verwaltungsratmitglied: Harpert varı Dijk

11 July 2022

Embassy ofthe Federal Republic of Germany
Beijing
China

Personnel

Applicant: wu

Dear Sir or Madam:

This letter confirms that Tesla Manufacturing Brandenburg SE (“Tesla”) have invited
to visit our factory site located in

Gigafactory Berlin (“Giga Berlin”) from 18-Jul-2022 until 17-Oct-2022 for business purposes.

Tesla has entered into a contract with for the procurement of production equipment. The purchase
is subject to the Purchase Order N 3 BR Tesla and Purchase Agreement").

The contract requires that furfili their obligation to Tesla by providing an adequate number of
personnel to support activities pertaining to the equipment purchased by Tesla. As such, these
activities can neither be performed remotely nor can they be postponed; otherwise, the contractual
delivery date will not be met in Germany. This invitation is submitted on behalf of the below listed
individual to enter Germany.

The Critical Nature of the Project

 

Tesla has procured equipment manufactured b BE for our powder coating lines which supports
Tesla’s cutting-edge battery cells. Specifically, HMMM wi be providing Giga Berlin a powder-coating
facility for the site’s battery top covers. This facility consists of a pre-treatment line that includes
washers and tanks of the top covers, conveyors, handling robots, and ovens for curing the powder. The
purpose of this line is to coat the top cover of Tesla’s battery cells with a corrosion-resistant and
insulation layers. Ultimately, these layers enhance battery performance and longevity. The powder
coat equipment and related systems will be delivered from China to Germany and must be
integrated with existing equipment in order to ensure seamless functionality and production
efficiency. The equipment requires in-person testing and validation that cannot be completed remotely,
as the commissioning activities require the equipment manufactured byllsauire testing in real-time
in order to ensure functionality and efficiency, and so that the local team may be trained on how to
urgently resolve any technical issues that may arise.

The Critical Need for Personnel to Enter German

Bu provides highly customized powder coating equipment, and every project requires unique
knowledge and experience that can only be gained by local personnel who have intimately been
involved in the development and build of the machines, which takes place in China. As a result,
proprietary information is essential and cannot easily be located or replicated locally in
Germany. Further, installation and commissioning can only be done on-site within Giga Berlin, and
as such the personnel’s on-site physical presence is required in order to effectively facilitate the
activities related to the ramp-up of the equipment being procured by Tesla. In this regard, Tesla
requires the in-person technical support of the highly skilled experts from WE in order to ensure
the overall system runs properly and the local Tesla team are adequately trained to action the day-
to-day operation and maintenance of the equipment.
25

ET VER
| m —_ / ri Tesla Manufacturing Brandenburg SE
Tesla Straße 1

15537 Grünhelde (Mark)

Germany

Registration Gourt Frankfurt/Oder, HRB 18107
Geschäftsführender Direktor: Stephan Werkman
Verwaltungsratmitglied: Harpert van Dijk

The Applicant

Tesla confirms that we have invited the below-named applicant who has been appointed by lin
China to visit our Giga Berlin facility in Germany for installation support. The applicant's personal
details follow:

 
  
  
 
 

Full name
Passport Number:
Date of Birth:
Cell Phone Number:
Email Address:

   

     
 

to install, start-up, and perform related warranty services on the equipment. Further.

making

Conclusion

Given the criticality to our business and our project investment approximating $6 million to date,
urgent approval of the above listed application is appreciated.

In light of the above, we respectfully request that the Applicant be granted a one-year, multiple-
entry business visa. \

Thank you for your assistance on this matter, and please contact us if you have further questions.

Sincerely,
26

Date of Birth

First N NIE
ISA US (ex. 31-Dec- Passport Country Passport Number Residential Address

Company Name (ex. John DOE)

Name/City of
Applicable Consulate

Date of Entry Date of Departure
27


                                            
                                                
                                                28
                                            
                                        

Schünke, Peter

| U U;
Von: Schünke, Peter

Gesendet: Mittwoch, 29. Juni 2022 13:40

An:
Cc: . Heinrich, Sabine; Mersmann, Katharina;

Stacke, Dorothee
Betreff: AW: Support for Tesla Gigafactory Berlin
Anlagen: Bestätigung_MWAE_Tesla.pdf

3 DD

please find attached the requested letter. Please feel free to contact me in case of any further questions.
Best regards

Mit freundlichen Grüßen
Im Auftrag
Peter Schünke

Peter Schuenke

Division 44 - Foreign Trade, Trade Fairs

Ministry for Economic Affairs, Labour and Energy
of the State of Brandenburg
Heinrich-Mann-Allee 107

14473 Potsdam

Germany

phone: +49-331-866-1638

Fax: +49-331-866-1732

E-mail: peter.schuenke@mwae.brandenburg.de

‚Von:

Gesendet: Montag, 27. Juni 2022 23:30

An: Mersmann, Katharina <Katharina.Mersmann@MWAE.Brandenburg.de>; Schünke, Peter
<Peter.Schuenke@MWAE.Brandenburg.de>;
CE ich, 5:5:
<Sabine.Heinrich@MWAE.Brandenburg.de>

Betreff: RE: Support for Tesla Gigafactory Berlin

Hey Katharina — thanks for getting back to us!

Hi Peter — Apologies for the delay, and please see the attached completed Excel sheet for the applicant
FEB ve do not have access to the applicant’s home address at this time, but we will loop back with you as

soon as it has been confirmed to us. Additionally, please refer to the attached Support Letter confirming Tesla’s need

for the applicant’s entry into Germany.

Please let us know if you require any further information.

Many thanks in advance,
29

901 Page Avenue, Fremont, California 94538

 
 

Please visit our Immigration site for more resources and information.

 

From: Mersmann, Katharina <Katharina.Mersmann@MWAE.Brandenburg.de>

Sent: Monday, June 20, 2022 12:28 AM
To:
Cc , Schünke, Peter
<Peter.Schuenke@MWAE.Brandenburg.de>; Heinrich, Sabine <Sabine.Heinrich@MWAE.Brandenburg.de>
Subject: AW: Support for Tesla Gigafactory Berlin

 
 
 

 

Hey

 

sorry for the late answer!
My colleague Peter Schünke on cc will take care of it and get back to you asap.

: could you fill in the Excel attached with the traveller details and send us your personalized confirmations
from Tesla on the need for entry?

Many Thanks,
Katharina

Mit freundlichen Grüßen
LA.
Katharina Mersmann

Ministerium für Wirtschaft, Arbeit und Energie des Landes Brandenburg
Heinrich-Mann-Allee 107 | 14473 Potsdam
Referat für Innovationspolitik, Technologieförderung

Tel.: (+49) 331 - 866 1707 | E-Mail: katharina.mersmann@mwae.brandenburg.de
Web: www.mwae.brandenburg.de

 

Das Ministerium für Wirtschaft, Arbeit und Energie verarbeitet die für die Bearbeitung Ihres Anliegens
erforderlichen personenbezogenen Daten. Die Datenschutzhinweise finden sie hier,

Von!

Gesendet: Dienstag, 14. Juni 2022 19:18

An: Mersmann, Katharina <Katharina.Mersmann@MWAE.Brandenburg.de>
Cc:
30

Betreff: Support for Tesla Gigafactory Berlin
Confidential Business Information
Hi Katharina,

I! hope this message finds you well. | was hoping you might be able to assist us with a challenge for one of our
Chinese suppliers. Tesla has procured equipment manufactured by

(EEE integral to our manufacturing of cutting-edge battery cells. We need the supplier personnel to be able to
visit the Giga Berlin site to install, commission and ensure functionality ofthe equipment in time for our planned
start of production. Any delays in the entries would pose risk to delay the overall program. The Consulate General of
Germany in Shanghai has advised that the EU travel restrictions have not been lifted for travelers from China, and in
order for personnel to be eligible for a visa, the applicant must present a signed declaration clearly stating the
critical need to have their presence onsite at Giga Berlin from approximately July 4th through August 22nd, 2022.

Would you be able to help us with documentation of the criticality ofthe Giga Berlin program to MWAE and the
economic interests of Germany? n cc can coordinate to provide you with the traveler details.

 

Thanks

esia Road, Austin,
31


                                            
                                                
                                                32
                                            
                                        

LAND BRANDENBURG Ministerium für Wirtschaft,

 

Arbeit und Energie
Ministerium für Wirtschaft, Arbeit und Energle des Landes Brandenburg | Heinrich-Mann-Allee 107 | 14473 Potsdam Heinrich-Mann-Allee 107
Tesla Manufacturing Brandenburg SE 14473 Potsdam
er Bear: Hr. Schünke
Tesla Straße 1 Gesch.Z.:
Telefon: (0331) 866 1638
n , Fax:
15537 Grünheide (Mark) Internet: www.mwae.brandenburg.de

peter,schuenke@mwae.brandenburg.de

Potsdam, 29. Juni 2022

Bestätigung eines wichtigen Interesses der brandenburgischen Wirtschaft
zur Vorlage beim zuständigen Generalkonsulat der Bundesrepublik Deutsch-
land in China

Sehr geehrt

die Tesla Manufacturing Brandenburg SE, Grünheide, hat gegenüber dem Ministe-
rium für Wirtschaft, Arbeit und Energie Brandenburg erklärt, dass die Geschäfts-
reise von

Vollständiger Name:

Geburtsdatum!

Reisepass Land: China
Reisepassnummer:

 
  
  
 
 

Mitarbeiter von (ER), von größter
Bedeutung, dringend notwendig und unaufschiebbar ist, um von Mil gelieferte
Ausrüstungsgegenstände vor Ort im Tesla Automobilwerk in Grünheide, Branden-
burg zu installieren und in Betrieb zu nehmen sowie Mitarbeiter vor Ort zu schulen.

Vor dem Hintergrund bereits geschaffener und noch zu schaffender Arbeitsplätze
sowie der entstehenden Zulieferbeziehungen ist das Vorhaben der Tesla Manufac-
turing Brandenburg SE in Grünheide von großer wirtschaftlicher Bedeutung für das
Bundesland Brandenburg. Die Größe des Projektes zur Automobilproduktion sowie
die Errichtung einer Batterieproduktion am Standort können große wirtschaftliche
Effekte in ganz Deutschland und der EU entfalten.

Mit freundlichen Grüßen
Im Auftrag

Stacke

Die genannte E-Mail-Adresse dient nur dem Empfang einfacher Mitteilungen ohne Signatur und / oder Verschlüsselung. Zertifikat selt 2019
Die Datenschutzhinweise des Ministeriums für Wirtschaft, Arbeit und Energie zum Umgang mit Ihren personenbezogenen audit berufundfamliie
Daten finden Sie auf unserer Internetseite unter dem Link: “
https: /Imwae.brandenburg.de/de/informationen-zum-datenschutz/bb1.c.531681.de.

Bei Bedarf können wir Ihnen diese Datenschutzhinweise postalisch zusenden.
33


                                            
                                                
                                                34
                                            
                                        

Zur nächsten Seite